Porsche 928 Workshop Manual page 381

Hide thumbs Also See for 928:
Table of Contents

Advertisement

24
LH-Jetronic
928
TEST POINT
1
Checking
Ground
and
Plug
Connections
See page 28
53.
1.2 If battery
voltage is not displayed,
pull
off relay XVI and bridge terminals
30
and 79.
Recheck voltage on LH multiple
pin
plug between terminals
9 and 5.
TEST POINT 2
2.
Fuel
Pump
The fuel pump relay is activated
Power
Supply
for
LH
Control
negatively
by the LH control
unit.
Unit
and
Fuel
Pump
1.
LH
Control
Unit
Switch off ignition
and pull off multiple
pin plug on LH control
unit.
1 .I Switch
on ignition.
Measure voltage on multiple
pin plug
between terminals
9 and 5.
Specification:
battery
voltage.
If value deviates from specification,
measure voltage on plug X connected
on central electric
board between
terminal
8 and ground,
4
3
2
1
I
I
I
;X'
I
I
I
8
7
6
5
.l Connect
terminal
17 on disconnected
LH control
unit plug on ground with a
piece of wire.
2,
3.
Fuel pump relay should be activated
and
fuel pump must run.
If pump does not run, check fuse no. 13
and relay XVII
activation
as well as fuel
pump relay.
Checking
Control
Signal
for
Electronic
Ignition
to
LH
Control
Unit
Pull off multiple
pin plug on LH control
unit; leave plug on electronic
ignition
control
unit.
3.1 Connect
positive
test lead of oscilloscope
on terminal
1 and negative test lead on
ground.
Specification:
battery
voltage
24-112
Troubleshooting
LH-Jetronic
Printed in Germany

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents