Porsche 928 Workshop Manual page 421

Hide thumbs Also See for 928:
Table of Contents

Advertisement

24
Electronic
Fuel
Injection
- LH-Jetronic
928
lO.Unbolt
intake
manifold
from
cylinder
head and lift
slightly.
Disconnect
all
remaining
vacuum
and crankcase
breather
hoses and
remove intake
manifold.
ll.Unbolt
throttle-valve
housing
from intake
manifold
and remove
rotary
idle
actuator.
Installing
l.Always
renew gaskets
for
intake
manifold.
Take care
to ensure
that
the
vacuum hoses and breather
hoses
are correctly
routed.
2.Carry
out visual
inspection
to
check for
leaks.
3.Check
that
vacuum hoses and hose
clamps
are correctly
seated.
Throttle-valve
housing
to intake
manifold
attachment,
tightening
torque
20 Nm (14 ftlb).
Intake
manifold
to cylinder
head
attachment,
self-locking
nuts,
tightening
torque
15 Nm (11 ftlb).
Note:
Special
Tool
9266 can also
be used
to open other
2-pole
connectors.
a
24 - 224
Removing
and Installing
Rotary
Idle
Actuator
Printed
in Germany

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents