Porsche 928 Workshop Manual page 725

Hide thumbs Also See for 928:
Table of Contents

Advertisement

Manual
Transmission/Gears
and
Shafts
35
MEASURING
DISTANCE
"Z"
BETWEEN
INPUT
SHAFT
AND
PlNlON
SHAF'I
Since the new Porsche synchronizing
system does not employ circlips,
ir is important
to make sure
that distance
"2" is maintained
between end face of inpur shaft and 4rh/5rh speed hub on pinion shaft,
Dirrance
"Z"
0.2 to 0.3 mm up to transm.
no. 118 1092
0.4 to 0. 6 mm from rransm. no. 118 lo!13
1. Measure distance
'7"
between input shaft and
Note
hub with a feeler gage.
Do not measure distance between synchronizer
ring and shift sleeve or clutch body and shift
sleeve.
2. If distance
"2" is nor 0. 2 IO 0. 3 mm or
0.4 to 0. 6 mm. disassemble
pinion shaft
again and correcI shim thickness
"X".
Of
course, it will also be necessary to redeter-
mine shim thickness
'7'" on end of pinion
shaft.
hinted
in Germany - Il. 1919
Measuring
Distance
"Z" Between
Input Shaft and Pinion Shaft
35 - 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents