Porsche 928 Workshop Manual page 313

Hide thumbs Also See for 928:
Table of Contents

Advertisement

19
Engine
- Cooling
928
Function-testing
the flap
positioning
motor
With
a length
of cable,
connect
pin
7 (ground)
of plug
I to pin 5 (0%)
of plug
I (approx.
2 - 4 seconds).
The
the
flap
positioning
motor
moves to
0% position.
Connect
pin
7, plug
I and pin
2,
plug
II
(approx.
2 - 4 seconds).
The flap
positioning
motor moves to
the 30% position.
Connect
pin 7. plug
I and pin
1
(100%)
(approx.
2 - 4 seconds).
The flap
positioning
motor moves to
the
100%
position.
1' C-F-
Bi.
If
the flap
positioning
motor
fails
to assume one of the positions
stated,
use an ohrrmeter
to check
the
conductivity
of the control
unit
-
flap
positioning
motor
wire
harness.
If
the wire
harness
is OK the flap
positioning
motor
is defective.
19 - 24
Function-testing
Flap
Positioning
Motor
Printed
in Germany

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents