Porsche 928 Workshop Manual page 797

Hide thumbs Also See for 928:
Table of Contents

Advertisement

a
928
Auromatic
Transmission
/ Gears.
Valve
Body
38
Work
sequence
1. Connect gauge with 0 - 25 bar (0 - 350 psi)
range to main pressure gauge connection
a.
2. Connect gauge with 0 - 10 bar (0 - 140 psi)
range to governor pressure gauge connecrion 1.
Note
Before any other pressures are checked,
modulator
pressure must be measured at full throttle
in "D"
range ar 88 km/h (55 mph) with vacuum line
connected
(see page 38 - 9). Adjust if necessary.
Correct modulator
pressure automarically
affects
main pressure.
3. Connecr gauge with 0 - 10 bar (0 - 140 psi)
range IO modulator
pressure gauge connecrion
c.
Note
Pressure gauge set is set up in footwell
of front
passenger seat. Hoses are routed through window
of right door.
Hose adapters installed
a
Printed in Germany - II, 1979
Checking
Transmission
Operation
38 -
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents