Porsche 928 Workshop Manual page 385

Hide thumbs Also See for 928:
Table of Contents

Advertisement

24
LH-Jetronic
928
TEST POINT 6
2 = Idle speed contact
18 = Ground
3 = Full load contact
Note:
If idle speed switch has a break, there will be
no coasting shutoff.
If idle speed switch has a short circuit,
there
will be a single cutout
at high idle speed.
If full load switch
has a break, there will be
no full load enrichment.
If full load switch has a short circuit,
enrich-
ment will be too early and consequently
fuel
consumption
too high.
1. Checking
Fuel
Injectors
If engine can be operated,
pull off plugs
on injectors
separately.
If fuel injectors
are okay, engine speed
should drop each time.
If engine cannot be operated,
measure
voltage on one plug of injectors
against
ground.
One of both terminals
should have
battery
voltage.
Measure coil resistance of fuel injectors.
Specification:
15 - 17.5 ohms
(+ 15
.30 "C/+ 59
.86 "F).
2.
Checking
Injection
Timing
Adjust oscilloscope
according
to
instructions
supplied
with tester.
Connect adapter line (Bosch "L-Jetronic"
No. 1 684 463 093) between one fuel
injector
and corresponding
plug.
Caution!
Tester leads must not have contact
with
ground.
a
24 - 116
Troubleshooting
LH-Jetronic
Printed in Germany

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents