Toyota Avensis ZZT251 2003 Service And Repair Manual page 667

Table of Contents

Advertisement

127. INSTALL INJECTION PIPE SUB–ASSY NO.2
SST
09023–12700
HINT:
Perform the same procedures as injection pipe No. 1.
128. INSTALL INJECTION PIPE SUB–ASSY NO.3
SST
09023–12700
HINT:
Perform the same procedures as injection pipe No. 1.
129. INSTALL INJECTION PIPE SUB–ASSY NO.4
SST
09023–12700
HINT:
Perform the same procedures as injection pipe No. 1.
AVENSIS REPAIR MANUAL (RM1018E)
ENGINE MECHANICAL
PARTIAL ENGINE ASSY (1CD–FTV)
(d)
Using SST, tighten the nut of the injection pipe to the injec-
tor side.
SST
Torque:
42 N m (428 kgf cm, 31 ft lbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ft lbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ft lbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Y
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Y
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(e)
Install the 2 upper injection pipe clamps with the 2 nuts.
Torque: 5.0 N m (51 kgf cm, 44 in. lbf)
130. INSTALL FUEL INLET PIPE SUB–ASSY
NOTICE:
When assembling the pipe, perform the operation with the
engine cold under room temperature.
(a)
Temporarily install the inlet pipe.
http://vnx.su
09023–12700
14–297

Advertisement

Table of Contents
loading

Table of Contents