Toyota Avensis ZZT251 2003 Service And Repair Manual page 301

Table of Contents

Advertisement

10–12
B B
A
A
A
(c)
Rotation
Center of
Throttle Link
18Y
16.
INSTALL AIR CLEANER CAP SUB–ASSY
Torque: 1.5 N m (15 kgf cm, 13 in. lbf)
17.
INSTALL CYLINDER HEAD COVER NO.2
Torque: 7.0 N m (71 kgf cm, 62 in. lbf)
18.
ADD ENGINE COOLANT
19.
CHECK FOR ENGINE COOLANT LEAKS
20.
INSTALL ENGINE ROOM COVER SIDE
21.
INSTALL RADIATOR SUPPORT OPENING COVER
AVENSIS REPAIR MANUAL (RM1018E)
ENGINE CONTROL SYSTEM
14.
(a)
A
(b)
(d)
A
(c)
A78463
(d)
(e)
(f)
(g)
(h)
15.
(a)
65.1 mm
(2.563 in.)
A78468
(See page
16–7)
http://vnx.su
THROTTLE BODY ASSY (1ZZ–FE)
INSTALL THROTTLE BODY ASSY
Install a new gasket to the intake manifold.
Install the throttle body and the throttle body bracket with
the 3 bolts and 2 nuts. (A/T)
Torque:
30 N m (306 kgf cm, 22 ft lbf) for bolt and nut A
Install the throttle body and the throttle body bracket with
the 5 bolts and 2 nuts. (M/T)
Torque:
30 N m (306 kgf cm, 22 ft lbf) for bolt and nut A
13 N m (133 kgf cm, 10 ft lbf) for bolt B
Connect the ISC valve connector.
Connect the throttle position sensor connector.
Connect the ventilation hose.
Connect the water by–pass hose No. 2.
Connect the water by–pass hose.
INSTALL ACCELERATOR CONTROL CABLE ASSY
Install the accelerator control cable as shown in the il-
lustration.
Torque: 13 N m (129 kgf cm, 9 ft lbf)
(See page
16–1)

Advertisement

Table of Contents
loading

Table of Contents