Toyota Avensis ZZT251 2003 Service And Repair Manual page 642

Table of Contents

Advertisement

14–130
105. INSTALL MANIFOLD CONVERTER INSULATOR NO.1
Torque: 12 N m (122 kgf cm, 9.0 ft lbf)
106. INSTALL OIL LEVEL GAGE GUIDE
(a)
Apply a light coat of engine oil to the O–ring, install it to the oil level gauge guide.
(b)
Install the oil level gauge and guide with the bolt.
Torque: 9.0 N m (92 kgf cm, 80 in. lbf)
108. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSY (W/ VVT–i)
(a)
Apply light coat of engine oil to the new O–ring and install it to the camshaft timing oil control valve.
(b)
Install the camshaft oil control valve with the bolt.
Torque: 9.0 N m (92 kgf cm, 79 in. lbf)
SST
AVENSIS REPAIR MANUAL (RM1018E)
ENGINE MECHANICAL
PARTIAL ENGINE ASSY (1AZ–FE)
(b)
Install the No. 1 and No. 2 exhaust manifold stays with the
2 bolts and 2 nuts.
Torque: 44 N m (449 kgf cm, 32 ft lbf)
A52499
107. INSTALL INTAKE MANIFOLD
(a)
Install a new gasket and the intake manifold with the 5
bolts and 2 nuts.
Torque: 30 N m (306 kgf cm, 22 ft lbf)
A56446
109. INSTALL DRIVE PLATE AND RING GEAR OR
FLYWHEEL
(a)
Hold the crankshaft with SST.
SST
Adhesive:
Part No. 08833–00070, THREE BOND or equivalent
A77333
http://vnx.su
09213–54015 (91651–60855), 09330–00021

Advertisement

Table of Contents
loading

Table of Contents