4. PERIODICAL MAINTENANCE PROCEDURE
[1]
[1]
[2]
[2]
[1]
40
[2]
A0EDF2C018DA
A0EDF2C019DA
A0EDF2C020DA
[3]
[1]
[2]
A0EDF2C021DA
Field Service Ver. 2.1 Feb. 2012
5. Remove the C-clip [1], and remove
the tray 1 pick-up roller [2].
6. Remove the C-clip [1] and the bear-
ing [2].
7. Remove the C-ring [1] and the bear-
ing [2].
8. Remove the C-clip [1], and remove
the bearing [2] and spring [3].