Chapter 4 Installation; Required Tools; Site Preparation - Avaya W310 User Manual

Wlan
Hide thumbs Also See for W310:
Table of Contents

Advertisement

Chapter 4
Installation
The W310 WLAN Gateway is ready to configure once you complete the installation
instructions below.

Required Tools

You will need the following tools before starting the installation procedure:
Phillips (cross-blade) screwdriver

Site Preparation

You can mount the Avaya W310 in a standard 19-inch equipment rack in a wiring closet or
equipment room. When deciding where to position the unit, ensure that the W310 is:
Accessible and cables can be connected easily and according to network
Attached to cables away from sources of electrical noise such as radio transmitters,
broadcast amplifiers, power lines and fluorescent lighting fixtures.
Positioned so that water or moisture cannot enter the case of the unit.
Placed in a free flow of air around the unit and that the vents in the sides of the case are
not blocked.
Matched to the environmental conditions listed below:
Table 4.1
Operating Temp.
Rel. Humidity
Matches the power source specifications listed below:
Table 4.2
Input voltage
Power dissipation
Input current
Avaya W310 User's Guide
Environmental Prerequisites
0 to 40°C (32 to 104°F)
5% to 95% non-condensing
Power Requirements
AC
100 to 240 VAC, 50/60 Hz
280 W max
7 A maximum
design.
15

Advertisement

Table of Contents
loading

Table of Contents