Chapter 4
Installation
The W310 WLAN Gateway is ready to configure once you complete the installation
instructions below.
Required Tools
You will need the following tools before starting the installation procedure:
•
Phillips (cross-blade) screwdriver
Site Preparation
You can mount the Avaya W310 in a standard 19-inch equipment rack in a wiring closet or
equipment room. When deciding where to position the unit, ensure that the W310 is:
•
Accessible and cables can be connected easily and according to network
•
Attached to cables away from sources of electrical noise such as radio transmitters,
broadcast amplifiers, power lines and fluorescent lighting fixtures.
•
Positioned so that water or moisture cannot enter the case of the unit.
•
Placed in a free flow of air around the unit and that the vents in the sides of the case are
not blocked.
•
Matched to the environmental conditions listed below:
Table 4.1
Operating Temp.
Rel. Humidity
•
Matches the power source specifications listed below:
Table 4.2
Input voltage
Power dissipation
Input current
Avaya W310 User's Guide
Environmental Prerequisites
0 to 40°C (32 to 104°F)
5% to 95% non-condensing
–
Power Requirements
AC
100 to 240 VAC, 50/60 Hz
280 W max
7 A maximum
design.
15