Chapter 7: After installation
After initial configuration, perform the following steps:
Step 1: Test the installation
●
Step 2: Remove the installation equipment
●
Step 1: Test the installation
When the installation is complete, simple tests must be performed to test telephone and data
connectivity.
Test data connectivity by pinging the IP address of each device to test the device's connectivity
within the network and outside the network.
Test local data connectivity on-site by checking that you can send an email between two PCs
that are connected to the G250.
Test telephone connectivity as follows:
Test each telephone.
●
Test each trunk.
●
Perform a Local Survivable Processor (LSP) failover test if you have an S8300B installed
●
as an LSP.
Testing telephones
To test a telephone:
1. Make outgoing calls from the telephone. Make sure you hear a dial tone when you pick up
the receiver. Make sure you can make both an internal (within the local network) and an
external (outside the local network) call.
2. Make a call to the telephone from both within the network and outside of the network.
on page 67
on page 70