Budgeting Power; Post-Installation - Avaya W310 User Manual

Wlan
Hide thumbs Also See for W310:
Table of Contents

Advertisement

Budgeting Power

When deciding how many 800W PSUs to install in the APC external DC power shelf, you
need to take into account the configuration of the powerinline external power parameter in
the W310 switch (set using the set powerinline external power CLI command).
Refer to Table 5.3 for guidelines:
Table
5.3
No. of APC PSUs
powerinline external power = 300 W (default, maximum)
1
2
3
If you set the powerinline external power parameter to other values, you need to recalculate
the number of switches supported accordingly.

Post-Installation

The following indicate that you have performed the installation procedure correctly:
Table 5.4
Procedure
Powering the W310
If you do not receive the appropriate indication, please refer to
Installation".
Avaya W310 User's Guide
Budgeting Power
No. of W310 Mobility Gateways
supported
2
5
8
Post-Installation Indications
Indication
All front panel LEDs illuminate
briefly
Chapter 5
Powering Up the W310 WLAN Gateway
"Troubleshooting the
Troubleshooting
Information
Page 251
25

Advertisement

Table of Contents
loading

Table of Contents