ADIC Scalar 100 User Manual page 41

Quantum scalar 100: user guide
Hide thumbs Also See for Scalar 100:
Table of Contents

Advertisement

Table 2-2: Installation Steps
Step
3
4
5
6
7
8
9
Installation Checklist
Actions
Connect the service terminal to the
Service Port and start a terminal
emulation session.
Run the Ethernet cable from the
network hub to the SNC.
To connect the SCSI cables
appropriately, see "Library and
Controller Cabling to Drives" on
page 28
Turn on the Scalar 100 tape library.
After the Scalar 100 tape library has
finished cycling on, issue the
targets command from the service
terminal. It can take up to about 30
seconds for the devices to be available
for discovery.
Configure the Ethernet Port (Host
Name, Address, Routes, reboot)
Observe Ethernet Link LED.
Issue hostTypeShow command
from the service terminal to view host
type settings for the Fibre Channel
ports.
If the hosts that will be connected are
not the type shown, issue setHost
command from the service terminal to
set the host type for each Fibre
Channel port.
Comments and References
See "Connecting to the Service Port" on
page 163 for the required parameters.
None.
None.
Within one minute, the RDY LED on
the SNC should start flashing once per
second and the "done executing startup
script" message should be displayed on
the service terminal. Some time after
that, the Scalar 100 tape library will
also become available.
See the "targets" command on
page 241.
If all attached SCSI targets are not
shown and the Scalar 100 tape library
is finished with its power-up, go to
"SCSI MAP" on page 134.
Configure the Ethernet Port using
information in Step 7 in Table 2-1: Pre-
Installation Steps.
Refer to "SNC Network Setup" on
page 157.
If the Ethernet Link LED is not on, go
to the "Ethernet MAP" on page 147
See the "hostTypeShow"
command on page 204.
See the "setHost
[port],"OS"" command on page
224.
page 27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Snc 5101

Table of Contents