Plumbing The Fluidics Sample Delivery System For Nanolockspray Operation - Waters Vion IMS QTof Overview And Maintenance Manual

Hide thumbs Also See for Vion IMS QTof:
Table of Contents

Advertisement

Figure 5–122: Connecting the PEEK tubing
Divert valve
9. Using a long, finger-tight fitting, connect 1/16-inch, 1,000-mm, natural-colored PEEK tubing
to port 4 of the divert valve and thread it securely into the waste port.
Figure 5–123: Connecting the PEEK tubing
Waste port
10. Connect port 2 of the divert valve to the source probe, observing the relevant procedure:
• For the ESI probe, see
• For the IonSABRE II probe, see
11. Close the fluidics access door and replace the fluidics pump access panel.
Important:
doors to the fluidics system.
5.26.4 Plumbing the fluidics sample delivery system for
NanoLockSpray operation
This section explains how to plumb the NanoLockSpray sample delivery system for ACQUITY
UPLC M-Class applications.
Configuring for ESI mode (Page
Installing the IonSABRE II probe (Page
Ensure that the tubing does not become trapped when you close the access
March 17, 2021, 715005046 Ver. 03
Page 161
36).
41).

Advertisement

Table of Contents
loading

Table of Contents