Waters Vion IMS QTof Overview And Maintenance Manual page 122

Hide thumbs Also See for Vion IMS QTof:
Table of Contents

Advertisement

7. Firmly tighten the finger-tight PEEK nut on the outside of the source enclosure.
Notice:
To prevent pressure from forcing the tubing from the inside of the
source enclosure, firmly tighten the SealTight nut.
8. Use the extender tool to tighten the black SealTight nut on the inside of the source
enclosure.
9. Install the finger-tight PEEK nut and ferrule over the free end of the liner tube, taking care
not to damage the capillary.
10. Carefully thread the capillary through the probe-tip support on the reference-sprayer
assembly.
Figure 5–72: Reference-sprayer assembly:
Finger-tight PEEK nut and ferrule
Liner tube (from LockSpray reference-probe assembly)
Probe-tip assembly
Capillary
Probe tip
Probe-tip support
March 17, 2021, 715005046 Ver. 03
Page 122

Advertisement

Table of Contents
loading

Table of Contents