Installing The Ionsabre Ii Probe - Waters Vion IMS QTof Overview And Maintenance Manual

Hide thumbs Also See for Vion IMS QTof:
Table of Contents

Advertisement

3.3.1 Installing the IonSABRE II probe

Required materials
• Chemical-resistant, powder-free gloves
• Utility knife or PEEK tubing cutter
To install the IonSABRE II probe:
Warning:
surfaces marked with the high-voltage warning symbol, ensure that the mass
spectrometer is in Standby mode.
1. Prepare the instrument so that you can work safely on the source (see
instrument for working on the source (Page
2. With the probe label facing you, carefully slide the IonSABRE II probe into the hole in the
probe adjuster assembly, ensuring that the probe location dowel aligns with the probe
adjuster assembly location hole.
Figure 3–6: Sliding the IonSABRE II probe into the probe adjuster assembly
Probe label
Probe locking ring
Probe location dowel
Location hole of the probe adjuster assembly
3. Tighten the probe locking ring to secure the probe in place.
To avoid harmless, static-like electric shock, before you touch any external
March 17, 2021, 715005046 Ver. 03
Page 41
53)).
Preparing the

Advertisement

Table of Contents
loading

Table of Contents