Waters Vion IMS QTof Overview And Maintenance Manual page 109

Hide thumbs Also See for Vion IMS QTof:
Table of Contents

Advertisement

ESI probe
Nebulizer adjuster knob
21. Fit the end cover and gasket around the nebulizer adjuster knob.
Important:
Ensure that the end cover's drip point is orientated so that, when viewed face-
on, the probe's warning label is directly to the left-hand side of the drip point, as shown in
the figure below.
Figure 5–59: Fitting the end cover and gasket
Drip point
ESI probe assembly
Capillary
Warning label
22. Secure the end cover and gasket to the ESI probe by tightening the three captive screws
using the 2.5-mm hex wrench.
23. Insert the new nickel gasket into the ESI probe tip so that the gasket is seated around the
narrow, stainless steel tube inside the probe tip.
March 17, 2021, 715005046 Ver. 03
Page 109

Advertisement

Table of Contents
loading

Table of Contents