Waters Vion IMS QTof Overview And Maintenance Manual page 166

Hide thumbs Also See for Vion IMS QTof:
Table of Contents

Advertisement

4. Using a long, finger-tight fitting, connect orange, 1/16-inch, 1,000-mm PEEK tubing from
port 2 of the sample selector valve to the wash bottle.
Requirement:
Push the tubing to the bottom of the wash solution and secure it so that it
cannot float to the surface during use.
5. Using a long, finger-tight fitting, connect orange, 1/16-inch, 680-mm PEEK tubing from port
4 of the sample selector valve through tubing guide A and into reservoir bottle A.
Figure 5–130: Connecting the PEEK tubing
Tubing guide A
Reservoir bottle A
Tips:
Follow these suggestions if you encounter difficulty threading the tubing through the
guides:
• Thread the tubes upward from the bottom hole.
• Using needle-nose pliers, make a 20° bend, 10 mm from the end of the tubing. Then,
rotate the tubing as you thread it through the guide.
6. Repeat this procedure for port 5 to reservoir bottle B and port 6 to reservoir bottle C.
7. Using two long, finger-tight fittings, connect the red, 1/16-inch, 200-mm PEEK tubing from
port 3 of the sample selector valve to port 3 of the divert valve.
March 17, 2021, 715005046 Ver. 03
Page 166

Advertisement

Table of Contents
loading

Table of Contents