Waters Vion IMS QTof Overview And Maintenance Manual page 101

Hide thumbs Also See for Vion IMS QTof:
Table of Contents

Advertisement

Circular plate
4. Ensure that the slide port's lock nut is screwed fully toward the slide port's circular plate.
5. Pull the capillary through the slide port so that the end of the capillary aligns with the end of
the PTFE liner tube, as shown.
Figure 5–48: Pulling the capillary through the slide port
Capillary
Liner tube
Liner tube and capillary ends aligned
Ferrule
6. Insert the capillary and liner tube fully into the PEEK union, ensuring that the capillary end
is flush with the liner tube end.
Rationale:
Doing so ensures that the capillary correctly aligns with the PEEK union.
March 17, 2021, 715005046 Ver. 03
Page 101

Advertisement

Table of Contents
loading

Table of Contents