Alcatel-Lucent 1677 SONET Maintenance And Trouble Clearing page 299

Hide thumbs Also See for 1677 SONET:
Table of Contents

Advertisement

3EM13853AF
Issue 01, September 2007
Is state of ECC IS,STBYH?
32
Replacement ECC should be in standby state within 3 minutes.
33
Repeat step 30.
If card is not in "IS,STBYH" state after 5 minutes, go to step 42.
Is ECC just replaced a protect module (located in slots IOC-1-A, IOC-1-B, IOC-17-A,
34
or IOC-17-B)?
Enter
35
where:
AID=Equipment Access Identifier of the ECC just replaced.
Did output return COMPLD or DENY?
36
Enter
37
where:
AID=Equipment Access Identifier of the ECC just replaced.
Did output return COMPLD or DENY?
38
Switch traffic to the replacement ECC?
39
Enter
40
where:
AID=Equipment Access Identifier of the replacement ECC.
Replace DS3 Card with an ECC Card
If yes, go to step 34.
If no, go to step 33.
If yes, go to step 35.
If no, go to step 37.
ALW-SWTOPROTN-EQPT::AID;
If COMPLD, go to step 43.
If DENY, go to step 42.
ALW-SWTOWKG-EQPT::AID;
If COMPLD, go to step 39.
If DENY, go to step 42.
If yes, go to step 40.
If no, go to step 43.
SW-TOWKG-EQPT::AID;
to allow switching to protection.
to allow switching to working.
to switch protection ECC to working.
DLP-147
5-109

Advertisement

Table of Contents
loading

Table of Contents