Appendix A Async Terminal Operations; Establishing A Connection To The Node - Cabletron Systems Netlink FRX8000 User Manual

Fully integrated lan/wan enterprise switch
Hide thumbs Also See for Netlink FRX8000:
Table of Contents

Advertisement

Establishing a Connection to the Node

Before establishing an end-to-end link, an async terminal must make a connection to
the async PAD, as follows:
1. Once the node, async terminal, and any modems in the link are powered on, do
this at the terminal:
If a specific line speed is configured in the Port record, go to step 2.
If the async PAD port is configured (in the Port record) for autobaud and parity
auto-detect, press
If the port is configured for autobaud only, press
Data bits and parity settings must match throughout an
asynchronous connection.
2. If the async PAD port is configured (in the Port record) to not require login,
go to step 3. If login is required, enter (when prompted) the login password
defined in the Async PAD Login record (described on page 13-8).
3. The Async PAD banner (described on
the terminal screen. (See "
Service Signals.") The terminal is now in
paragraph.
Async Terminal Operations
, then
, then
[Enter]
[.]
[Enter]
page
Version ".n.n" Asynchronous PAD
Appendix A
.
.
[Enter]
A-5) will be displayed at the top of
" under "Async PAD
mode, described in the next
Command

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Netlink FRX8000 and is the answer not in the manual?

Questions and answers

Table of Contents