Monthly Maintenance
12-6
Carry out the following maintenance procedure monthly:
• Carry out the weekly routine.
• Carefully clean the camera lens using general purpose
cleaning solution and a lint free cloth.
• Clean and lubricate the gantry rails (shown below).
Power down the PC before performing the following checks.
• Turn off the sj5000 using the START key switch and turn the
mains isolator to the OFF position. Open the rear access
panel and visually inspect the electrical control panel.
• Inspect all electrical equipment on the machine for damaged
contacts, exposed wire and frayed insulation.
• Clean the conveyor optical sensors with a dry cloth.
• Check that the cables going to the PC are tight.
• Check all connections on the lighting controller, terminals
and PLC modules.
• Check all cables on the lighting head and XY table and ensure
that none are loose or damaged.