3
Installation
Checking the Facilities and Tools
Unpacking the sj5000
3-2
Ensure that the system environment meets the specifications
(see
"Environmental
Preparation Manual for details.
Required Tools
The following tools are required for sj5000 installation:
• Set of metric hexagonal Allen keys: 1.5, 2, 2.5, 3, 4, 4.5, 5, 5.5,
6, 7, 8, 9, and 10
• T30 TORX key
• Set of insulated slotted screwdrivers: 2.8, 4.0, 5.5, and 6.5
• Pistol grease gun
• THK AFB+70 (lithium based) grease
• 25 mm/46 mm spanner
The sj5000 is shipped on a wooden pallet with a cardboard box
enclosing the system.
Unpack the sj5000 as follows:
1
Check all the Tip'n'tell indicators and shock sensors.
Figure 3-1
shows their locations on the box. Refer to the
details on the indicators to verify pass or failure.
If any of them are activated, the sj5000 may have a problem.
Do not remove anything and report the situation to Agilent.
2
Remove the straps holding the cardboard box in place.
3
Remove the cardboard edge protectors.
4
Remove the top of the cardboard box, and lift the remainder
of the box away from the wooden pallet.
5
Undo the ratchet straps that hold the sj5000 to the wooden
pallet.
The sj5000 can now be lifted off the pallet using a forklift and
moved into position. See
notes and instructions.
Conditions"). Refer to the Site
"Moving the sj5000"
Agilent U1840A Medalist sj5000 Hardware Manual
for important