Agilent Technologies U1840A Medalist sj5000 Hardware Manual page 52

Automated optical inspection system
Table of Contents

Advertisement

4
Starting Up the Medalist sj5000
Before Powering Up
4-2
Before turning the Medalist sj5000 on at the mains isolator, do
the following:
1
Make sure the mains isolator is switched off, then remove the
rear access panel.
2
Measure the voltage between live (phase 1) and neutral
(phase 2) at the mains isolator. The voltage should be 100 to
120 VAC or 200 V to 240 VAC.
3
Ensure the system is correctly earthed.
Now you can power up the sj5000 as described in the following
pages. Refer to
Figure 4-1
buttons to use.
Figure 4-1
Controls on the switch plate at the front of the machine
for the locations of the switches and
Agilent U1840A Medalist sj5000 Hardware Manual

Advertisement

Table of Contents
loading

Table of Contents