Section 2 - System Setup; Unpacking - Newport ESP6000 User Manual

Motion controller/driver
Table of Contents

Advertisement

Section 2
System Setup
2.1

Unpacking

Section 2 — System Set-Up
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
This Section defines the hardware and software requirements for operation,
the equipment controls and indicators, and the step-by-step procedures
needed to prepare the system for use.
Before unpacking any components, inspect the shipping container(s) for
evidence of damage. Notify the shipping carrier of damage.
All equipment is packaged in electrostatic material. Unpack carefully
to avoid damage to equipment and packing materials.
Remove the packing list from the shipping container(s). Verify that the
items listed on the packing slip are in the container(s). Refer to Appendix G,
Factory Service, for reporting discrepancies.
The ESP6000 controller card and stages are sensitive to static
electricity. Wear a properly grounded anti-static strap when
Further inspection of equipment should be made with the following
precautions:
– Do not remove the ESP6000 controller card from the anti-static ship-
ping bag until you are ready to begin installation.
– Avoid touching components on the ESP6000 controller card.
– Hold the ESP6000 controller card by its edges or mounting brackets.
All equipment is tested and inspected prior to shipment. Inspect the
equipment, and refer to Appendix G, Factory Service, for reporting
discrepancies.
CAUTION
CAUTION
handling equipment.
2 - 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Unidrive6000

Table of Contents