System Connection - Terumo Advanced Perfusion System 1 Operator's Manual

Table of Contents

Advertisement

Roller Pumps

System Connection

Route and arrange the pump cable to minimize exposure to spills. With a clear view
of the desired pump or module connection, carefully connect the pump cable to one
of the system pump connections on either side of the system base or, if necessary,
to any of the system module connections. Do not use excessive force to seat the
connector and make sure not to bend the connector pins. Tighten screws to secure
the connection.
Standoffs are included in the accessories kit. Two standoffs must be installed on
a module receptacle to securely fasten a pump cable or a flowmeter cable to the
module receptacle. Only a pump power cable or flowmeter power cable can be
inserted into a receptacle which has the standoffs installed. Modules cannot be
inserted into a module receptacle when standoffs are installed.
5-6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Advanced Perfusion System 1 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

801763801764

Table of Contents

Save PDF