Connecting To The Electricity Source - Waters SYNAPT G2 Operator's, Overview And Maintenance Manual

Hide thumbs Also See for SYNAPT G2:
Table of Contents

Advertisement

2.
Connect the free end of the shielded Ethernet cable to the Ethernet card
on the preconfigured ACQUITY UPLC
On preconfigured systems, the Ethernet card is identified as the
Tip:
Instrument LAN card.
3.
Connect one end of the second shielded network cable to the port labeled
instrument LAN on the rear panel of the mass spectrometer (see
page
B-16).
4.
Connect the free end of the shielded Ethernet cable to the network
switch.

Connecting to the electricity source

Caution:
complete the installation procedures in the previous sections.
The mass spectrometer requires a separate, grounded electricity source. The
ground connection in the electrical outlet must be common and connected near
the system.
Required materials
Power cord appropriate to your country.
To connect to the electricity source
Recommendation:
(UPS) for optimum long-term input voltage stability.
Warning:
United States and HAR-type (or better) in Europe. For information
regarding what cord to use in other countries, contact your local Waters
distributor.
1.
Connect the female end of the power cord to the receptacle on the rear
panel of the mass spectrometer (see
2.
Connect the male end of the mass spectrometer power cord to a suitable
200 to 240 V a.c. wall outlet.
B-22
External Connections
Do not connect the instrument's power supply cord until you
Use a line conditioner or an uninterruptible power supply
To avoid electrical shock, use the SVT-type power cord in the
®
workstation.
page
B-2).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents