Waters SYNAPT G2 Operator's, Overview And Maintenance Manual page 218

Hide thumbs Also See for SYNAPT G2:
Table of Contents

Advertisement

3.
Route the waste line to the waste container. If necessary, shorten the
waste tubing so that its end is above the surface of the waste solvent.
Positioning of drain tubing
B-14
External Connections
To prevent leakage of biologically hazardous
Warning:
materials,
• do not crimp or bend drain line. A crimp or bend can
impede flow to the waste container.
• empty the waste container before the lower end of the
drain tubing is covered by waste solvent.
Correct
Incorrect
TP01807

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents