Waters SYNAPT G2 Operator's, Overview And Maintenance Manual page 191

Hide thumbs Also See for SYNAPT G2:
Table of Contents

Advertisement

7.
Using two long "finger tight" fittings, connect the red, 1/16-inch,
200-mm, PEEK tubing from port 3 of the sample selector valve to port 3
of the divert valve.
A
A
B
B
C
C
8.
Using a long "finger tight" fitting, connect 1/16-inch, 1000-mm,
natural-colored PEEK tubing to port 4 of the divert valve, and thread it
securely into the waste port.
This is the same waste port as used in
Tip:
C
B
A
Wa ters
C
A
B
Replacing the IntelliStart Fluidics tubing 5-113
Divert valve
step
3.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents