Waters SYNAPT G2 Operator's, Overview And Maintenance Manual page 117

Hide thumbs Also See for SYNAPT G2:
Table of Contents

Advertisement

1.
Remove the ion block assembly from the source assembly (see
page
5-31).
2.
Ensure that the isolation valve is closed.
3.
Grasp the cone gas nozzle handle, and use it to rotate the sampling cone
assembly through 90 degrees.
Caution:
after reassembly,
• do not remove the sampling cone assembly retaining blocks.
• do not adjust the screws securing the sampling cone assembly
retaining blocks.
4.
Slide the sampling cone assembly out of the ion block assembly.
To ensure correct operation of the ion block assembly
Isolation valve handle
in closed position
Sampling cone
assembly retaining
blocks
Cone gas nozzle
handle
Cleaning the ion block assembly
5-39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents