Waters SYNAPT G2 Operator's, Overview And Maintenance Manual page 150

Hide thumbs Also See for SYNAPT G2:
Table of Contents

Advertisement

1.
Using the sharp knife or PEEK tubing cutter, cut an approximately
60 cm (24 inches) piece of red PEEK tubing squarely (that is,
perpendicular to its horizontal axis).
2.
Insert one end of the red PEEK tubing in the probe inlet connector, and
screw the connector, finger-tight, into the PEEK union.
Rationale:
capillary.
3.
Fit the UNF coupling to the new capillary.
4.
Using the needle-nose pliers, slide a new ferrule onto the capillary.
5.
Insert the capillary in the PEEK union, and ensure that it is fully
seated.
6.
Screw the UNF coupling into the PEEK union, finger-tight only.
7.
Gently tug on the capillary, testing to ensure that it stays in place.
8.
Using the 7-mm wrench, tighten the locknut against the PEEK union.
5-72
Maintenance Procedures
Doing so ensures a minimum dead volume when fitting the
Probe inlet connector
PEEK tubing
To avoid high-pressure liquid jet spray, wear safety
Warning:
goggles when performing the leak test.
TP02671

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents