Assembling The Source Ion Block Assembly - Waters SYNAPT G2 Operator's, Overview And Maintenance Manual

Hide thumbs Also See for SYNAPT G2:
Table of Contents

Advertisement

5.
Inspect each component for persisting contamination.
Requirement:
procedure.
If contamination is still present, dispose of the component, and obtain a
new one before reassembling the sampling cone assembly.

Assembling the source ion block assembly

Required materials
Chemical-resistant, powder-free gloves
Combined 2.5-mm Allen wrench and cone extraction tool
Needle-nose pliers
Isopropyl alcohol in small container
To assemble the ion block assembly
Caution:
• To avoid recontaminating the ion block assembly, wear clean
chemical-resistant, powder-free gloves during this procedure.
• The extraction cone is fragile. Never place it on its tip; always place it
on its flanged base.
1.
Fit the extraction cone seal to the ion block.
Caution:
aperture when fitting the extraction cone to the ion block.
2.
Fit the extraction cone handle insulator to the extraction cone handle.
3.
Fit the extraction cone to the ion block.
4.
Fit the 2 PEEK extraction cone retainer clips to the ion block.
The components can be contaminated with
Warning:
biohazardous and/or toxic materials. Dispose of them
according to local environmental regulations.
If contamination is present, repeat the cleaning
Take great care not to damage the extraction cone
Cleaning the ion block assembly
5-47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents