Required materials
•
Chemical-resistant, powder-free gloves
•
SYNAPT G2 fluidics tubing and fitting kit
This kit contains components for both the sample and LockSpray
Tip:
system plumbing.
To plumb the analyte system
Warning:
contaminated with biohazardous and/or toxic materials. Always
wear chemical-resistant, powder-free gloves while working on the
system.
1.
Open the access doors to the IntelliStart Fluidics system.
Caution:
end. Ensure that you tighten the fittings appropriately.
2.
Using the stainless steel tubing, connect the sample pump to port 7 of
the sample selector valve.
A
B
C
Lock-spray pump
The IntelliStart Fluidics tubing and fittings can be
The steel tubing requires high-pressure seals at each
Sample selector valve
A
B
C
C
B
A
Wa ters
B
C
A
Replacing the IntelliStart Fluidics tubing 5-109