Waters SYNAPT G2 Operator's, Overview And Maintenance Manual page 148

Hide thumbs Also See for SYNAPT G2:
Table of Contents

Advertisement

6.
Remove the PEEK union/UNF coupling assembly and capillary from the
probe.
7.
Using the 7-mm wrench, loosen the locknut.
8.
Unscrew the PEEK union from the UNF coupling (this connection is
finger-tight only).
9.
Remove the ferrule from the capillary.
10. Remove the capillary from the UNF coupling.
11. Dispose of the capillary and ferrule in accordance with local
environmental regulations.
5-70
Maintenance Procedures
PEEK union/UNF coupling assembly
Capillary
Locknut
Ferrule
The capillary and ferrule can be contaminated
Warning:
with biohazardous and/or toxic materials. Dispose of them
according to local environmental regulations.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents