LIGHTS/METERS/SWITCHES
REMOVAL/ INSTALLATION
Remove front cowl (page 2-2).
Remove the dust cover.
Disconnect the combination meter Grey 16P connector
assembly.
TORQUE: 4.0 N.m (0.4 kgf.m, 2.9 lbf.ft)
Remove the screws (3 nos.) and washers.
Remove the combination meter assembly from front cowl
stay.
Installation is in the reverse order of removal.
DISASSEMBLY
Remove the screws (6 nos.), meter lower cover and upper
cover.
Check that the indicators function properly.
If they do not function, perform the power and ground line
inspection combination meter.
COMBINATION METER ASSEMBLY
UPPER CASE
17-6
UNDER CASE
SPEEDOMETER
GASKET
16P CONNECTOR
SCREWS/WASHERS
SCREWS
DUST COVER
SCREWS