Precautions, Procedures And Settings For Replacing Pc Boards And Hdd; Precautions When Replacing Pc Boards - Toshiba e-STUDIO 5540C Service Manual

Multifunctional digital color systems
Hide thumbs Also See for e-STUDIO 5540C:
Table of Contents

Advertisement

9.2
Precautions, Procedures and Settings for Replacing PC
Boards and HDD
9.2.1

Precautions when replacing PC boards

The ID for each equipment is registered on the LGC board, the IMG board, the SYS board and the
SLG board. So, if their replacement is required, be sure to replace only one board at a time.
If more than one of the LGC board, the IMG board and the SYS board require replacement, replace
them in the following procedure.
1. First, replace one of the board to be replaced.
2. Turn the power ON and confirm that "READY" is displayed.
3. Turn the power OFF.
4. Replace another board that requires replacement.
5. Repeat steps 2 to 4.
The LGC board and IMG board can be replaced without other settings.
When the HDD requires replacement, see  P. 9-25"9.2.3 Precautions and procedures when
replacing the HDD".
When the SYS board requires replacement, see  P. 9-30"9.2.4 Precautions and Procedures when
replacing the SYS board".
When the SLG board requires replacement, see  P. 9-34"9.2.5 Procedures and settings when
replacing the SLG board".
When SRAM board requires replacement, see  P. 9-35"9.2.6 Precautions and Procedures when
replacing SRAM board (for SYS board)" /  P. 9-42"9.2.7 Precautions and Procedures when
replacing SRAM board (for LGC board)".
e-STUDIO5540C/6540C/6550C/5560C/6560C/6570C
REPLACEMENT OF PC BOARDS/HDD
© 2011 - 2015 TOSHIBA TEC CORPORATION All rights reserved
9 - 22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents