Siemens Sinamics S120 Function Manual page 209

Hide thumbs Also See for Sinamics S120:
Table of Contents

Advertisement

Figure 4-31
Signal diagram, bypass with synchronization with overlap
The motor is transferred to the line supply
(the drive converter controls contactors K1 and K2):
● The initial state is as follows: Contactor K1 is closed, contactor K2 is open and the motor
● The control bit "bypass command" (p1266) is set (e.g. from the higher-level automation).
● The bypass function sets the control word bit "synchronizing" (r1261.2).
● Since the bit is set while the converter is running, the "Transfer motor to supply"
● After the motor has been synchronized to the line frequency, line voltage and line phase,
● The bypass mechanism evaluates this signal and closes contactor K2 (r1261.1 = 1). The
● After contactor K2 has signaled back the "closed" state (r1269[1] = 1), contactor K1 is
● If the on command is withdrawn in this phase, the drive converter changes into the basic
Retrieving the motor from supply mode functions the same but in reverse:
At the start of the process, contactor K2 is closed and contactor K1 is opened.
● The "Command bypass" control bit is canceled (e.g. by the higher-level automation).
● The bypass function sets the control word bit "synchronizing".
Drive functions
Function Manual, (FH1), 01/2012, 6SL3097-4AB00-0BP2
is fed from the drive converter.
synchronization process is started.
the synchronizing algorithm reports this status (r3819.2).
signal is internally evaluated - BICO wiring is not required.
opened and the drive converter inhibits the pulses. The drive converter is in the "hot
standby" state.
standby state. If the appropriate contactors are being used, the drive converter is isolated
from the line supply and the DC link is discharged.
Vector control
4.25 Bypass
207

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents