This chapter lists the procedures to be performed before operation of CC-Link IE Field Network.
Remark
• The programming chapter in this manual provides examples for each procedure (from "System consideration" to
"Debugging") described below. (
• When using the master/local module with a C Controller module, refer to Page 531, Appendix 7.
Check box
System consideration
Consider the system configuration and link device assignments.
Mount the master/local module to the base unit.
Perform a unit test on each module.
Connect an Ethernet cable to each module.
Perform a cable test on the master/local module.
46
PROCEDURES BEFORE OPERATION
Installation
Unit test
Wiring
Cable check
To the next page
Page 387, CHAPTER 11)
Page 48, CHAPTER 5
Page 124, Section 8.1.1
Page 63, Section 6.1
Page 64, Section 6.2
Manual for slave stations
Page 68, Section 6.3
Page 78, Section 6.4.2

Advertisement

Table of Contents
loading

Table of Contents