PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Station number setting
Set a station number for the D/A converter module using the station number setting switch.
Page 28 Station Number Setting
2.
Mounting
Mount the D/A converter module to the DIN rail.
Page 29 Installation Environment and Installation Position
Page 31 Installation
3.
Wiring
Connect a power supply, an Ethernet cable, and external devices to the D/A converter module.
Page 33 Wiring
4.
Parameter settings and programming
Set parameters and create a program.
Page 42 Parameter Settings
Page 48 How to Change the Parameters
Page 77 PROGRAMMING
*1 To replace the module, refer to the point below.
To replace the module, follow the procedure described below:
3 PROCEDURES BEFORE OPERATION
24
Downloaded from
ManualsNet.com
• Turn off the module power supply and remove the D/A converter module.
• Prepare a new D/A converter module and follow the steps from "Station number setting" to "Parameter
settings and programming" mentioned above. (Re-setting network parameters of the master station is not
required.)
• Carry out operation check and then restart the control.