3.
Select "Hold Input Data (RX/RY)" under "Data Link Faulty Station Setting".
Project window
4.
Open the refresh parameter window and set parameters as follows.
Project window
5.
Write the set parameters to the CPU module on the master station.
[Online]
In this setting example, default settings are used for the parameters other than those described. For the parameter setting,
refer to the chapter explaining the parameters. (
190
[Parameter]
[Network Parameter]
button
[Parameter]
[Network Parameter]
button
[Write to PLC]
Page 81, CHAPTER 7)
[Ethernet/CC IE/MELSECNET]
[Ethernet/CC IE/MELSECNET]