Starting Up The System - Mitsubishi Electric QJ71GF11-T2 User Manual

Melsec-q series cc-link ie field network master/ local module
Table of Contents

Advertisement

(4) Starting up the system

Reset the CPU module or power off and on the system in order of the local station, master station, and
submaster station.
Start up the master station before the submaster station. If the submaster station is started up first, it may operate as a
master operating station. Even if the submaster station operates as a master operating station, the master station starts to
take in control after it starts up. Then Data link status (own station) (SB0049) temporarily turns on, causing an error to be
detected. (This applies when "Return as Master Station" is selected in the "Operation Setting for Returning" field in the
supplementary setting.)
The LEDs on the master/local module are as follows.
Master station (master operation)
S
1
1
1
RUN
T
.
N
2
2
MODE
O
.
4
4
SD
8
8
ERR.
X100 10
1
RESET
or Power OFF
Local station
S
1
1
MST
1
RUN
T
.
N
2
D LINK
2
MODE
O
.
4
RD
4
L ERR.
8
8
ERR.
X100 10
1
ON
Submaster station (submaster operation)
S
1
MST
T
.
N
D LINK
O
.
SD
RD
L ERR.
X100 10
CHAPTER 8 FUNCTIONS
1
1
RUN
MST
2
2
MODE
D LINK
4
4
SD
RD
8
8
L ERR.
ERR.
1
: ON
: Flashing
193
8

Advertisement

Table of Contents
loading

Table of Contents