Connecting The Workstation (Systems With No Acquity Lc) - Waters Xevo G2-XS QTof Overview And Maintenance Manual

Hide thumbs Also See for Xevo G2-XS QTof:
Table of Contents

Advertisement

Connecting the workstation (systems with
no ACQUITY LC)
Before connecting the workstation to the instrument, set up the workstation
according to its accompanying instructions. Locate the workstation within
3 meters (10 feet) of the mass spectrometer.
Requirement:
ensure compliance with FCC limits.
To connect the workstation:
1.
Connect the monitor to the workstation PC.
2.
Connect one end of the shielded, crossover, network cable to the port
labeled instrument LAN on the workstation rear panel.
3.
Connect the free end of the shielded, crossover, network cable to the
Ethernet port in the top, right-hand corner of the mass spectrometer's
rear panel.
To connect the workstation to the power source:
Notice:
complete the installation procedures in the previous sections.
1.
Select the appropriate power cord for your location.
2.
Connect the female end of the power cord to the power port on the rear
panel of the workstation.

Connecting the workstation (systems with no ACQUITY LC)

Use shielded network cables with the mass spectrometer to
Do not connect the workstation's power supply cord until you
April 2, 2015, 715004496 Rev. B
291

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents