Waters Xevo G2-XS QTof Overview And Maintenance Manual page 79

Hide thumbs Also See for Xevo G2-XS QTof:
Table of Contents

Advertisement

Warning:
toxic materials, and to avoid spreading contamination to
uncontaminated surfaces, wear clean, chemical-resistant,
powder-free gloves while performing this procedure. The source
components can be contaminated.
To avoid electric shock, prepare the instrument for work
Warning:
performed on its source before beginning this procedure.
To install the ionKey source:
1.
Prepare the instrument for working on the source (see
Warning:
with the probe and source; these components can be hot.
2.
Remove the probe from the currently installed source:
If you are removing an ESI probe, see
If you are removing an IonSABRE II probe, see
3.
Remove the existing source enclosure (see
4.
Open the access doors to the IntelliStart Fluidics system.
To avoid personal contamination with biohazards or
To avoid burn injuries, take great care while working
Installing the ionKey source
page 99).
page
61.
page
page
100).
April 2, 2015, 715004496 Rev. B
65.
79

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents