Waters Xevo G2-XS QTof Overview And Maintenance Manual page 281

Hide thumbs Also See for Xevo G2-XS QTof:
Table of Contents

Advertisement

To connect the oil-free roughing pump:
1.
Locate the pump in an area where the ambient temperature is 12 to
40 ºC (54 to 104 ºF).
2.
Install the pump within ten degrees of horizontal.
3.
To ensure proper ventilation, install the pump observing the minimum
clearances shown in the following figure:
Back side minimum clearance
is 150 mm
Left side minimum clearance
is 150 mm
Warning:
pump.
4.
Place the pump on the floor, within 1 m (3 feet 3 inches) of the
instrument.
5.
Using an NW40 center ring, attach the flanged end of the vacuum hose
to the roughing pump inlet flange, and then secure the connection with
an NW40 clamp, tightening it with the 7-mm nut driver.
Connecting the Edwards oil-free roughing pump
To avoid personal contamination with
Warning:
biologically hazardous, toxic, or corrosive materials, and
to avoid spreading contamination to uncontaminated
surfaces, wear clean, chemical-resistant, powder-free
gloves when working with the pump and its
connections.
To avoid lifting injury, at least two people must raise the
Right side minimum clearance
is 150 mm
TP03165
Front side minimum clearance
is 150 mm
April 2, 2015, 715004496 Rev. B
281

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents