6 Maintenance Procedures
Required materials
•
Chemical-resistant, powder-free gloves
•
The Xevo G2-XS QTof Fluidics Tubing and Fitting Kit
This kit contains components for both the sample and LockSpray
Tip:
system's plumbing.
To plumb the analyte system:
1.
Open the access doors to the IntelliStart Fluidics system.
2.
Using the stainless steel tubing, connect the sample pump to port 7 of
the sample selector valve.
Requirement:
You must tighten the fittings appropriately.
A
B
C
Sample pump
236
April 2, 2015, 715004496 Rev. B
To avoid personal contamination with biologically
Warning:
hazardous, toxic, or corrosive materials, and to avoid
spreading contamination to uncontaminated surfaces, wear
clean, chemical-resistant, powder-free gloves when working
with tubing and fittings.
The steel tubing requires high-pressure seals at each end.
A
B
C
C
B
A
Wa ters
C
B
A
Sample selector valve