Hardware Installation Sequence
Hardware Installation Sequence
The following steps are required to install a RADWIN 5000 HPMP system:
1. Mounting the ODUs,
2. Mounting the external antennas (if used),
3. Mounting the Lightning Protection devices (if used),
4. Outdoor connections,
5. Connecting the PoEs,
6. Other Indoor connections,
7. Aligning the HSUs to the HBS,
See
Figure 3-16
below, which illustrates a typical installation of a RADWIN 55xx HSU with
an external antenna.
Figure 3-16: Typical HSU installation with external antenna
The HBS installation differs only in the antenna type: It uses a sector antenna.
The installation steps are detailed in the following sections.