GE H
DRAFT
EALTHCARE
D
5460683, R
IRECTION
EVISION
ELECTRICAL SAFETY
Electrical Test Performed
Outlet (correct ground &wiring config.)
System Ground Continuity
Chassis Source Leakage Current - Probe
Chassis Source Leakage Current - Wheel
Chassis Source Leakage Current - CRT
Patient Lead Source Leakage
(Lead to Ground)
Patient Lead Source Leakage
(Lead to Lead)
Patient Lead Source Leakage
(Isolation)
Peripheral 1 Leakage Current
Peripheral 1Ground Continuity
Peripheral 2 Leakage Current
Peripheral 2Ground Continuity
Peripheral 3 Leakage Current
Peripheral 3Ground Continuity
Probe Number
(from previous page)
Probe 1:
Probe 2:
Probe 3:
Probe 4:
Probe 5:
Probe 6:
Probe 7:
Probe 8:
Probe 9:
Final Check. All system covers are in place. System scans with all probes as expected.
Accepted by: ______________________________________________________________________
3
DRAFT (J
Max Value
Allowed
PROBES
Max Value
Allowed
Chapter 10 - Care & Maintenance
25, 2014)
UNE
Value
Measured
OK?
Max Value
Measured
OK?
LOGIQ™ S7 E
/P
XPERT
RO
S
M
ERVICE
ANUAL
Comments
Comments
10-35
Need help?
Do you have a question about the LOGIQ S7 Expert and is the answer not in the manual?