CHAPTER 4
This chapter explains the procedure before operation.
The following describes the procedure before operation.
*1
MELSEC-L CPU Module User's Manual (Hardware Design, Maintenance and Inspection)
*2
Page 60, Section 6.2
*3
Page 62, Section 6.3
50
PROCEDURE BEFORE OPERATION
Start
Mount the master module, local module and
standby master module at any configuration.
Mount the remote modules on the control panel
and machine.
Check the master module, local module and
standby master module individually to see
if they operate normally (hardware test).
Connect the modules with ver.1.10 compatible
CC-Link dedicated cables. Connect terminating
resistors to the modules located at both ends.
Check the following befor turning power ON:
Module installation status
Input power voltage
The programmable controller CPU switch
is set to "STOP"
Turn the power ON
To the next figure
*1
*2
*3
RUN/STOP/
RESET switch