Mitsubishi Electric L26CPU-BT User Manual page 116

Melsec-l cc-link system master/local module
Hide thumbs Also See for L26CPU-BT:
Table of Contents

Advertisement

[Data link startup]
1.
When the programmable controller system is powered on, the network parameters in the
programmable controller CPU are transferred to the master station, and the CC-Link system
automatically starts up.
[Remote input]
2.
The remote input RX of a remote device station is stored automatically (for each link scan) in the
master station's "remote input RX" buffer memory.
3.
The input status stored in the "remote input RX" buffer memory is stored in the CPU device set
with the automatic refresh parameters.
Programmable
controller CPU
X
[Remote input RX when the AJ65BT-64AD is set to station number 1]
Device No.
RX00
RX01
RX02
RX03
RX04
RX17
RX18
RX19
RX1A
RX1B
RX1C
RX1F
114
Master station
Remote input RX
RX0F to RX00
RX1F to RX10
RX2F to RX20
3)
RX3F to RX30
RX4F to RX40
RX5F to RX50
RX6F to RX60
RX7F to RX70
RX8F to RX80
to
RX7FF to RX7F0
Signal direction: AJ65BT-64AD  Master module
Remote device station
(Station number 1:
occupies 2 stations)
Remote input RX
Handshaking signals
such as remote READY
and initial data
processing request flag
RX0F to RX00
2)
RX1F to RX10
2)
Signal name
CH1 A-D conversion completed flag
CH2 A-D conversion completed flag
CH3 A-D conversion completed flag
CH4 A-D conversion completed flag
Not used
Initial data processing request flag
Initial data setting complete flag
Error status flag
Remote READY
Not used
Remote device station
(Station number 3:
occupies 2 stations)
Remote input RX
Handshaking signals
such as remote READY
and initial data
processing request flag
RX0F to RX00
RX1F to RX10

Advertisement

Table of Contents
loading

This manual is also suitable for:

L26cpu-pbtLj61bt11

Table of Contents